RAIL TANKER
INTERNAL WASHING
COMPLEXES
FROM CRUDE OIL AND PETROLEUM PRODUCTS
KVO-JCnp
Offered by «CTG» complexes for internal cleaning of railway tankers from crude oil and various petroleum products are designed to prepare the internal surfaces of the tanker for repair or for filling in the resource-saving environmentally safe closed mode. Complexes KVO-JCnp can have various equipment and efficiency (6, 12, 25, 50, 75, 100, 150, 200 or more units per day), as well as the automation degree of technological processes. The advantages of the KVO-JCnp are small resource consumption (washing spray operating pressure is 8–12 kg/cm2 at the cleaning solution temperature 45–55°C), low duration of treatment (approximately 20–30 minutes) and low consumption of cleaning solution (approximately 1.0–1.2 kg of self-cleaning solution «O-BISM» carry-over on one tanker), that depend on the amount and type of petroleum products remaining in the tanker, as well as on the volume of the tanker and the time of year. All the above makes the cleaning cost several times less than that with the traditional technologies.
Self-contained mobile washing complex for tank cleaning
1 – Washing module WM-02; 1.1 – Pumping system;
1.2 – Separator and solution storage tank; 2 – Additional equipment module AEM-01;
3.1 – Erecting mast; 3.2 – Process cover; 3.3 – Process bottom plate;
3.4 – Bottom discharge device; 4 – Service-utility module.
To minimize the assembly work and implement the possibility to move the mobile equipment to another location with minimum effort, all main systems in charge of the processes are compactly arranged inside the 20-feet containers.
Specifications of the
mobile washing complex KVO-JCnp
№ |
Technical characteristics |
Unit of |
Value |
1. |
Efficiency |
units/day |
6 |
2. |
Minimal dimensions of site for placement of equipment - length |
mm |
6000 |
3. |
Installed electrical power |
kW |
31,00 |
4. |
Water consumption for technical needs |
m3/day |
0,30 |
5. |
Coolant consumption |
GCal/day |
0,72 |
6. |
Compressed air consumption |
m3/day |
1,38 |
7. |
Number of service stuff |
person/shift |
2 |
If you have questions about our equipment, please contact us, our coordinates are listedon the contact page, andalsoviathe order form.