Specialists of «CTG» prepared technical task, the program and methods of work in the field of non-destructive testing of highly reliable contact of the copper wire. Agreed with the customer.
Specialists of «CTG» prepared technical task, the program and methods of work in the field of non-destructive testing of highly reliable contact of the copper wire. Agreed with the customer.
From 29.04. on 07.05.2013, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of Omsk, etc.
From 22.04. on 26.04.2013, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of Saint-Petersburg, etc.
Developed a technology solutions for modernization of equipment for washing trucks and undercar parts of subway cars in cooperation with the SUE «Saint Petersburg Metro».
Specialists of «CTG» in highly reliable non-destructive testing inspection found the optimal solution welds. In the near future will be tested in the normal mode.
From 15.04. on 19.04.2013, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of Saint-Petersburg, etc.
Work began on the development of a new set of highly reliable non-destructive testing for the diagnosis of oxygen-free copper wire rod, which allows to detect both surface and sub-surface defects, but also located throughout the section.
Shipped the equipment manufacturing «CTG» wash boiler tank cars to our partners in Atyrau (Kazakhstan).
From 01.04. on 05.04.2013, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of Surgut, Perm, etc.
Representatives «CTG» took part in the discussion of problems and opportunities for further controlled operating sets of highly reliable non-destructive testing «SSC» and «ICH»in October, and the East-Siberian Railway, which was held at the Office of the Central Directorate of rolling stock infrastructure, branch of JSC «Russian Railways».