In the interests of our partners, a washing complex has been optimized for processing (washing, rinsing and drying) the exterior surfaces of trolleybus bodies. |
[29.09.2023] Supplies of technical detergents to partners During the period from 25.09.2023 to 29.09.2023, planned deliveries of SMTP "O-BIS", SMTP "O-BISM" for our partners to the cities of St. Petersburg and Yekaterinburg were carried out. |
In the interests of our partners, the washing complex for the processing (washing, rinsing and drying) of bus bodies has been optimized. |
[22.09.2023] Supplies of technical detergents to partners During the period from 18.09.2023 to 22.09.2023, planned deliveries of SMTP "O-BIS", SMTP "O-BISM" for our partners to the cities of St. Petersburg and Kazan were carried out. |
In the interests of one of our Customers, a closed-cycle technology for cleaning the boilers of railway tank cars from vegetable oils and the bodies of hopper cars from vegetable raw materials has been optimized. |
In the interests of our partners, a car-washing complex has been optimized for processing (washing, rinsing and drying) the bodies of motor-car rolling stock of portal-type railway transport. All the offered equipment is developed by us and manufactured in Russia, which guarantees prompt delivery and budget cost with the highest quality standards and duration of operation of the car wash complex. |
[15.09.2023] Supplies of technical detergents to partners During the period from 11.09.2023 to 15.09.2023, planned deliveries of SMTP "O-BIS", SMTP "O-BISM" for our partners to the cities of St. Petersburg and Aleksin were carried out. |
[13.09.2023] The supply of components has been made The supply of components to the gas condensate field facility in the Irkutsk region of the Russian Federation was made in the interests of one of our permanent partners. |
In the interests of one of the largest metallurgical companies, the main technical solutions for the de-icing treatment of gondola car bodies have been worked out. |
[08.09.2023] Supplies of technical detergents to partners During the period from 04.09.2023 to 08.09.2023, planned deliveries of SMTP "O-BIS", SMTP "O-BISM" for our partners to the cities of St. Petersburg and Samara were carried out. |