Has been developed a cost-effective environmentally safe technology of "cold" treatment of boilers of railway tank cars from under oil cargo, designed for use in the reconstruction of stationary washing and steaming stations.
Has been developed a cost-effective environmentally safe technology of "cold" treatment of boilers of railway tank cars from under oil cargo, designed for use in the reconstruction of stationary washing and steaming stations.
Has been developed a basic project of turnkey construction of mobile transportable equipment for processing boilers of railway tank cars, flasks of tank containers and compartments of tankers from petrochemical cargoes with an average capacity of 20 units per day.
For the period from 08.04.2019 to 12.04.2019 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Astrakhan and Saint-Petersburg.
Was made a presentation of innovative technologies and equipment of CTG in Rosneft. Has been agreed a program of implementation of these developments.
CTG took an active part in the 10th Northern dimension Forum dedicated to business development between the North-West region and the Nordic countries of the European Union.
A representative of CTG made a presentation at the section on engineering and industry.
For the period from 01.04.2019 to 05.04.2019 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Moscow and Saint-Petersburg.
CTG took an active part in the exhibition "Days of innovations", held at the Military Academy of logistics named after General of the army A. V. Khrulev. The exhibition presented modern and promising technologies and military and dual-use products, including CTG`s products, which may be of interest to various departments of the Armed Forces of the Russian Federation.
Is made shipment of the second batch of the equipment of washing and recycling station for processing of internal surfaces of boilers of railway tank cars from under light and dark oil products with a productivity of 25 units a day within the signed contract with one of our partners.
For the period from 25.03.2019 to 29.03.2019 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Kaliningrad and Saint-Petersburg.
For the period from 18.03.2019 to 22.03.2019 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Perm and Saint-Petersburg.