The meeting with one of the logistic companies, who is interested in construction of a complex of processing equipment for preparation of coppers of railway tank cars from under oil products in repair at the car-repair plant is held.
The meeting with one of the logistic companies, who is interested in construction of a complex of processing equipment for preparation of coppers of railway tank cars from under oil products in repair at the car-repair plant is held.
For the period from 24.07.2017 to 28.07.17, planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Saint-Petersburg and Moscow.
The contract for delivery of a complex of processing equipment for internal cleaning of coppers of railway tank cars from under light and dark oil products with a productivity of 25 units a day for one of our permanent partners is signed.
For the period from 17.07.2017 to 21.07.17, planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Saint-Petersburg, Moscow and Novosibirsk.
The automated systems of movement and positioning of rail cars allowing to provide without locomotive safe evacuation of structures from one railway track of the terminal on another during emergency and fire-dangerous situations are worked out. Anticorrosive properties of coverings for the purpose of protection against harmful effects and ensuring the long working condition of the equipment are improved.
It is applicable on fire-dangerous sites of loading and unloading of sulfur.
For the period from 10.07.2017 to 14.07.17, planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Saint-Petersburg.
The meeting with representatives of one of the leading global manufacturers of fertilizers is held. They are interested in construction of a complex of processing equipment for cleaning of "hopper" cars from under water-soluble and water insoluble pollution.
Planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Saint-Petersburg and Cheboksary for the period from 03.07.2017 to 07.07.2017.
The contract for delivery the top jobs of workers completing for systems of providing, which allow to carry out washing of coppers of railway cars tanks on two railway tracks at the same time, with one of our foreign partners is signed.
For the period from 26.06.2017 to 30.06.17 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Saratov.