NEWS & EVENTS

[14.10.2014]  Modernization equipment

Based on the results of operating sets of technological equipment for processing internal surfaces of boilers rail tank cars modernized process covers КT-04 and КT-04-M1, which will reduce the cost and improve the technological parameters.

From 29.09. on 03.10.2014, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of St. Petersburg, Frolovo (Volgograd region).

[07.10.2014]  Designing

Completed and handed over to foreign partners construction project for the treatment of external and internal surfaces of boilers rail tank wagons.

[07.10.2014]  Desig

Completed and handed over to foreign partners construction project for the treatment of external and internal surfaces of boilers rail tank wagons.

From 22.09. on 26.09.2014, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of Perm.

[30.09.2014]  Technological equipment

Actualized block diagram of the construction of complex technological equipment preparation of internal surfaces of ship's tanks from the liquid hydrocarbons.

From 15.09. on 19.09.2014, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of St. Petersburg, Irkutsk.

[23.09.2014]  Technological equipment

Updated typical block diagram of the construction of the complex process equipment preparation of internal surfaces of freight wagons of the "hopper" from the water-soluble dietary products using hydrodynamic effects.

From 08.09. on 12.09.2014, the plan was implemented SMTP delivery «O-BIS», SMTP «O-BISM» for our partners in the city of St. Petersburg.

[16.09.2014]  Technological equipment

Reworked typical block diagram of the construction of a block diagram of the construction of the complex process equipment preparation of internal surfaces of wagons of the "hopper" from the water-insoluble bulk materials, sulfur, coal, dolomite, apatite using a hydrodynamic effect.

Наверх