NEWS & EVENTS

[01.10.2012]  

The specialists of «CTG» took an active part in the international forum «Russian industrialist» and international innovation Forum in St.-Petersburg, which took place on 25-28 September 2012, at the exhibition complex «LENEXPO». According to their results, «CTG» is awarded with the diploma of the participant.

From 21.09. on 28.09.2012, the plan was implemented SMTP delivery "O-BIS," SMTP "O-BISM" for our partners in the city of St.-Petersburg, etc.

In motorvagonny depot "Zheleznodorozhnaya" of the Moscow railway-branch of JSC "RZD" balancing and commissioning on commissioning of processing equipment of a vagonwashing complex is successfully complete.

Specialists of «CTG» a config file for control gears. Now in depot St. Petersburg Baltiysky TCH-15 commenced work on identifying defects in the gears.

[25.09.2012]  New software

We developed a new software for complex «SCS» PSK Touch (Qt). Conducted the testing and debugging of the software product, which enables you to create protocols for flaw detection in real time and be able to print the information obtained in the process of execution of works that would considerably reduce the time of diagnosis.

25-28 September 2012, «CTG» will participate in the international forum «Russian industrialist» and international innovation Forum in St. Petersburg. Will be represented by «CTG» complexes series «SCS» and «ICH» (booth № 34). On a visit to the exhibition, please call the Executive Office 7 (812) 234-19-24, 224-41-03.

Specialists of «CTG» developed the configuration file for monitoring procedure of cogwheels. Now in depot of Sankt-Petersburg-Baltiysky TCh-15 works on detection of defects of cogwheels are begun.

Made shipment «intelligent» hammer control «ICH» manufactured «CTG» for the East-Siberian railway.

Specialists of «CTG» developed and agreed with the management of St. Petersburg SUE Petersburg Metropolitan program and method of trial operation autonomous bloc «SCS» to weld the frame carts and load-bearing structures (cross beams) of bodies of subway series «E», «Em», 81-series and their modifications.

Depot St. Inskaya tested set «ICH» verification time control manufacture of metal wheels and side frames bogies of freight cars. Tests confirmed the possibility of using complex «ICH»: -specialized ways to repair cars; -how the current coupling repair; -mechanized ways of preparation of wagons; -points, technical inspection of vehicles.

Наверх