NEWS & EVENTS

For the period from 24.02.2021 to 26.02.2021 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Saratov and Saint-Petersburg.

For the period from 15.02.2021 to 20.02.2021 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Yershov and Saint-Petersburg.

A certificate was obtained that the quality management system used by Clean Technologies Groups LLC in the preparation of project documentation for capital construction projects meets the requirements of GOST ISO 9001: 2015.

For the period from 08.02.2021 to 12.02.2021 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Novomoskovsk and Saint-Petersburg.

A contract was signed for the development of basic technical solutions for the preparation of hopper cars as part of a project to develop the production capacity of mineral fertilizers of one of the world's leading producers of phosphorus-containing fertilizers.

For the period from 01.02.2021 to 05.02.2021 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Moscow and Saint-Petersburg.

In the framework of the previously signed contract with one of our partners began erection and commissioning of process equipment transportable complex internal processing (washing, degassing and drying) applied to the railway tank wagons from different petroleum products capacity up to 12 units per day.

For the period from 25.01.2021 to 29.01.2021 planned deliveries of detergent «O-BIS» and detergent «O-BISM» have been carried out to our partners from Ryazan and Saint-Petersburg.

Within the framework of the previously concluded contract with one of our partners, the final third batch of a complex of technological equipment for internal processing (washing, rinsing, degassing and drying) of boilers of railway tank cars with an average capacity of 25 units per day from under oil cargo and 10 units per day from under coking resins was shipped.

Наверх